Central Lyon County Fire District 2006 Bond
General Description
The fire district contracted with Miles Construction as the Construction Manager to build the first two stations of a phased expansion of the districts assets.
The first station will be 8,000 sf and consist of 6,000 sf of apparatus bays and 2,000 sf of office and training facilities. The building is being designed for future expansion of 4,000 sf of living quarters in the event there is a future requirement for a fully manned station. The building will incorporate the use of radiant floor heating system throughout and will utilize solar heated water for that purpose. The district is investigating alternative heating solutions in an effort to reduce operating expenses. The structure will be a combination of masonry and a pre-engineered metal building. The objective with these materials was to represent the required look while reducing the construction costs.
The second facility the district and Miles Construction are currently working on design for will be larger and fully manned. Station 37, as it will be named is located in Stagecoach and will be a total of 12,000 sf and separated into 8,000 sf of apparatus bays and 4,000 sf of living quarters and office space